ESTATECONDOMINIUMS LIST

Advance Sannomiya Rassurer

Hanshin Main Line "Kasuganomichi" 5-minute walk to the station, Kobe Line "Kasuganomichi" a 9-minute walk to the station Hankyu, JR "Sannomiya" a 10-minute walk to the station, a 10-minute walk to the Hanshin Main Line "Sannomiya" station

Stimulating and exciting, stylish and with high sensitivity. Is directly connected to all the features and powerful, Kobe center to achieve a universal city style, and “Advanced Sannomiya Rashure” in Sannomiya area birth.

Some even of the station within walking distance, I draw a daily active. Spent an extensive business time, enjoy the glamorous shopping,
There the /// all to be healed in seaside landscape here is urban assets in the hands.

Name Advance Sannomiya Rassurer
Location 5-2-5 Azumadori Chuo-ku Kobe-shi
Transportation Hanshin Main Line "Kasuganomichi" 5-minute walk to the station, Kobe Line "Kasuganomichi" a 9-minute walk to the station Hankyu, JR "Sannomiya" a 10-minute walk to the station, a 10-minute walk to the Hanshin Main Line "Sannomiya" station
Area/District (日本) 近隣商業地域/防火地域
The Classification of land Residential land
The building-to-house ratio 82.85%
Floor area ratio 398.18%
Lot area 408.3m²
Building area 338.24m²
Building gross floor area 1987.46m²
Structure/Scale Reinforced concrete construction, 11 floors from the ground, 1 floors from underground
Total units 54Units
Selling units 54Units
Building certification number No. KKK01105377 (December 27, 2011)
Other (日本) 検査済証明番号:第KKK01206049号(平成24年12月17日)
Driveway burden None
Layout 2K/1DK/1LDK
Dwelling footprint 27.56m2~31.12m2
Balcony area 3.40m2~5.76m2
Parking 6
Motor cycle storage 3
Mini Motor cycle storage 5
Bicycle storage 54
Right form after selling lots The site is shared by the occupied area equal ratio
Management form The building site is owned jointly according to the shared ownership percentage of the exclusively-owned area, while the ownership of the building is based on individual condominium unit.
Completion December 2012 mid
Moving in January 2013 late
Seller Nissei Advance
Design/Supervision Sunada construction, Fukushima Yoichi Building Research Institute
Execution Sunada construction
Management company Global community Inc. / Advanced Management Inc.
Access to drawing and specification Advance Sannomiya Rassurer