ESTATECONDOMINIUMS LIST

ADVANCE OSAKALUORE DC

4 minutes walk from Osaka Metro Tanimachi Line "Tanabe" Station

EVERYDAY LIFE IN URBAN AND NATURE Living where the urban and the natural coexist as part of daily life.

With large commercial facilities like “Abeno Harukas” and diverse shops, as well as the lush “Tennoji,” Tennoji and Abeno become your living space. Additionally, the expansive “Nagai Park” with abundant sports and natural amenities is also a nearby location.

ADVANCE SERIES「ADVANCE OSAKALUORE DC」 INTRODUCTION VIDEO【LONG ver】

ADVANCE SERIES「ADVANCE OSAKA LUORE DC」 INTRODUCTION VIDEO【SHORT ver】

Name ADVANCE OSAKALUORE DC
Location 5-5-16, Kitatanabe, Higashi-Sumiyoshi Ward, Osaka City
Transportation 4 minutes walk from Osaka Metro Tanimachi Line "Tanabe" Station
Area/District (日本) 都市計画区域内、市街化区域、第一種住居地域、準防火地域、下水道処理区域
The Classification of land Residential land
The building-to-house ratio 66.39%
Floor area ratio 238.71%
Lot area Building confirmation target area: 325.38 sqm / Registered record area, actual area, and sales target area: 326.53m²
Building area 216.01m²
Building gross floor area 999.25m²
Structure/Scale 鉄筋コンクリート造・地上5階建
Total units 27 unitsUnits
Selling units 27 unitsUnits
Building certification number 第BVJ-NAG21-10-5101号(令和4年2月4日)
Other Number BVJ-NAG21-10-5101 (February 4, 2022)
Driveway burden Available: 1.15㎡ (Road setback area)
Layout 1R・1K
Dwelling footprint 27.50㎡~28.99㎡
Balcony area 2.25㎡~3.35㎡
Other Terrace Area: 5.65㎡~6.13㎡ / Private Garden Area: 6.16㎡~7.09㎡
Parking 1 Vehicle
Motor cycle storage 1 Vehicle
Mini Motor cycle storage 2 Vehicles
Bicycle storage 17 vehicles (Flat type: 3, Rack type: 14)
Right form after selling lots Common areas of land and buildings, as well as attached facilities, are shared based on the ownership ratio of exclusive area, while exclusive building areas are individually owned
Management form The management association is established by all unit owners, and the management association delegates to a management trustee
Completion March 9, 2023
Moving in Late April 2023
Seller Nissho Advance Co., Ltd.
Design/Supervision TMK ArchiWorks Co., Ltd.